A Message Board, Guestbook, or Poll hosted for your website.
REETECĀ® Message Board

Register  | Login  | 
 
REETEC > Message Board > QCWIN due date correction
 
Username:  
Password:  
 
   
 


Thread Tools  | Search This Thread 
Reply
 
Author Comment
 
Celia
Moderator
Registered: 26/11/07
Posts: 18

Contact using Skype

    12/09/08 at 10:33 AM
  Reply with quote#1

QCWIN due date calculation error

  1. This error only occurs when the most recent calibration is an external calibration.
  2. There is a specific sequence to recreate it.
  3. Select any gauge and look at the issues tab in the RHS window.
  4. Without changing the tab, move to a gauge where the most recent calibration is external by double clicking on the gauge record to open the edit window.
  5. Click the exit button. The due date will have changed.
  6. To repair this due date, click on the calibrations Tab in the RHS window. Click the Edit button or double click on the gauge to open the Edit Window. Click Exit.
    QCWIN VERSION 2.205 will correct this error. Please contact me for details on how to upgrade advising me of your current version.
Previous Thread | Next Thread
Reply

  Bookmarks  
Digg Diggdel.icio.us del.icio.usStumbleUpon StumbleUponGoogle Google